Applications and Forms
The buttons above link to our most commonly needed applications.
Job type and submittal requirements
(NOTE: other documents beyond what are listed below may be required)
- New Construction, Additions,
- TOML forms: permit application, project information, special inspection and testing agreement (if necessary)
- Full Plan set, including structural calculations, Title 24, soils report, etc.
- Alterations, repairs, remodels
- Many applications can be submitted with a detailed, written scope of work.
- However, the complexity of the job may necessitate drawings or other supplemental documents.
- TOML forms: permit application
- Limited Scope
- These permits consist of only one scope of work: windows, for example.
- Many limited scope permits are issued without a need for review, and can often be issued within 24 hours.
- If the job consists of only electrical work, only plumbing work, or only mechanical work, then it is considered limited scope.
- TOML forms: permit application, various other documents may be required depending on the scope
- Demolition
- A separate demolition permit is not required if there is an existing permit for the rebuild, repair, or remodel portion of the job.
- However, if the nature of the entire project requires a lengthy review process, a separate demolition permit can be issued so that work can begin to prepare for the larger scope.
- TOML forms: permit application, demolition permit requirements
- Reroof and Siding
- A reroof or siding permit is not required if the scope consists of less than 200 square feet of material being replaced.
- TOML forms: permit application, roofing and siding permit conditions
- Woodstove/Fireplace
- TOML forms: permit application, flue certification
- Manufacturer's minimum clearances to combustibles specifications (usually found in the appliance installation manual)
Other Applications and Forms (sorted alphabetically):
- AC Permit Program - Site Information
- Approved Fabricator Requirements
- Authorized Agent Form
- Building Height Certificate
- C&D Application
- C&D Release Form
- Code Compliance Complaint Form
- Construction Power Agreement
- Demolition Permit Requirements
- Disabled Access Compliance Documentation
- Eligibility Checklist for Expedited Electric Vehicle Charging Station Permit
- Flue Certification
- Landscape Documentation Package
- LPG Permit Program - Site Information
- Owner / Builder Declaration
- Owner / Builder Authorized Agent
- Parking Special Permit Application
- Residential Rooftop Solar Checklist
- Residential Standby Generator Checklist
- Roofing and Siding Permit Conditions
- Solar Photovoltaic Exceptions
- Special Inspection and Testing Agreement